Sulfate Soil Stabilization in Texas: Test First, Then Pick the Treatment.

Sulfate heave has wrecked roads and pads from Sherman to Laredo, usually a year or more after a lime job passed inspection. The fix starts with knowing your number. This page covers how to test, what the thresholds mean, where the sulfate belt runs, and which treatment fits each level. Hasten supplies the materials for all of them.

Know the number before the truck. A three-minute conductivity test on site and a 30-minute colorimeter test give you ppm. Sample every 100 feet and at depth.
Above 7,000 ppm, lime alone is out. TxDOT guidance says so. Slag cement with 1 percent lime is the researched answer.
Call 832-655-7763

Send Your Sulfate Numbers

We will tell you what fits. Same-day response.

Why Lime Heaves Sulfate Clay

Four ingredients together grow ettringite, a mineral that takes up about twice the volume of what it replaced: a calcium stabilizer, clay, sulfate minerals such as gypsum, and water. The reaction runs until an ingredient is gone and can take years to surface. Lime is the calcium. Add more and you feed it.

It looks fine at inspection

Ettringite forms slowly. The subgrade passes density, the pavement goes down, and the heave arrives with the first wet season or the third.

It hides at depth

On US 82 near Sherman the surface read 4,160 ppm and 41 inches down read 27,840. Gypsum washes down. A cut-and-fill job can bury a clean test and expose a bad one.

It runs in seams

On FM 3338 in Webb County an 8-mile job tested under 2,000 ppm everywhere until a re-test found a 40,000 ppm section. One test across a project is not a test.

The map warns you

The Geologic Atlas of Texas flagged six of eight failure sites in the TxDOT research before anyone set foot on them. Look for selenitic or gypsiferous in the legend.

The Thresholds and What to Do at Each

From TxDOT guidance and research project 0-4240.

Soluble sulfateTxDOT guidanceTreatment Hasten supplies
Under 3,000 ppmNormal construction with calcium stabilizersLime, kiln dust, or fly ash-lime blend; buy the cheapest calcium that does the job
3,000 to 7,000 ppmModified construction: single lime application, mellowing 2 to 10 days, moisture 2 percent above optimumSame materials, different method; slag-lime removes the mellowing wait and the risk
Above 7,000 ppmLime alone not recommended5% slag cement + 1% lime, or Class F fly ash + lime

Two counterintuitive findings from the research worth saying out loud: a single lime application reduces swell better than a double application, and higher molding moisture beats optimum moisture. The 7,000 ppm ceiling came from contractor and TxDOT field experience, not theory.

How to Test, On Site and in the Lab

Tex-146-E conductivity: a three-minute field test that flags problem areas. Read at time zero and again ten hours later, because coarse gypsum dissolves slowly and a low first reading can be a false negative.
Tex-145-E colorimeter: about 30 minutes, returns actual ppm. Run it wherever conductivity flags.
Sample every 100 feet along the alignment, and at treatment depth, not just the surface.
Test again after the site is at grade. Fill can bury the problem.
Check the Geologic Atlas for the formation before mobilizing. Eagle Ford, Blaine and Aguja are the known offenders.

Hasten crews can carry the conductivity meter to a site and tell a contractor his soil has a sulfate problem before anyone places material. Most people apply lime and hope.

Where the Sulfate Belt Runs

Dallas-Fort Worth and Ellis County

SH 161, SH 183, US 67 west of Midlothian. Eagle Ford formation. The original failures.

Grayson County

US 82 near Sherman. Sulfate seven times higher at depth than at the surface.

Central Texas along I-35

Blackland Prairie and Eagle Ford through Waco, Temple, Austin and San Antonio. Subdivisions and roadways on gypsiferous clay.

Laredo and Eagle Pass

FM 3338 in Webb County, where TxDOT wrote the slag-lime special provision, and a section near Eagle Pass above 32,000 ppm built with 4 percent slag and 1 percent lime.

Childress, Alpine, Van Horn

Blaine formation gypsum on US 287, the Aguja on SH 118, bolson deposits on SH 54. Not only a Blackland problem.

Ready for the treatment side?

The slag-lime numbers, the four field sites, the 5:1 and 5:2 ratios and the TxDOT construction sequence, on one page for the engineer.

Slag-Lime Stabilization

Serving the Sulfate Corridor and Beyond

Testing guidance and stabilization materials anywhere in Texas. Materials load in Houston.

DallasFort WorthMidlothianWaxahachieShermanWacoTempleAustinSan AntonioLaredoEagle PassHoustonChildressAlpine

Sulfate Soil Questions, Answered Straight

What sulfate level is too high for lime?

TxDOT guidance treats soils above about 7,000 to 8,000 ppm soluble sulfate as unsuitable for lime alone. Between 3,000 and 7,000, lime can work with modified construction: single application, mellowing, extra moisture.

How do I test soil for sulfate?

Tex-146-E conductivity in the field, three minutes, flags problem areas. Tex-145-E colorimeter gives ppm in about 30 minutes. Sample every 100 feet and at depth, and read conductivity twice, ten hours apart.

What stabilizer works on high-sulfate soil?

Five percent slag cement with 1 percent lime is the only treatment TxDOT research recommends above 7,000 ppm. Class F fly ash with lime is a live second option where the sulfate is gypsum. Hasten supplies both.

Does fly ash cause sulfate heave too?

Class C fly ash is a calcium donor and can, though it delivers less free lime per ton than lime and sets faster, which shortens the window. Above 7,000 ppm it is not the researched answer.

Can I just remove and replace the soil?

Sometimes. TxDOT lists removal, blending with granular material, and no treatment as alternatives above 8,000 ppm. On a low-plasticity soil, doing nothing can be the right call, and we will say so.

Building on Sulfate Clay?

Send the sulfate and PI numbers, the county and the depth. We will tell you what fits and what it costs per treated ton.